What should we send before a roof walk?
The roof address, leak history, known roof age, access notes, recent photos, tenant constraints, and any prior repair invoices help turn the first conversation into a useful scope.
Use these answers to prepare for a repair, coating review, maintenance plan, or replacement conversation.
The roof address, leak history, known roof age, access notes, recent photos, tenant constraints, and any prior repair invoices help turn the first conversation into a useful scope.
Often, yes. The plan still needs to account for noise, odor, loading, interior protection, tenant hours, rooftop equipment, and daily dry-in before production starts.
A coating is only realistic when the roof is dry enough, sound enough, cleanable, and compatible with the existing assembly. Moisture, adhesion, ponding, membrane condition, and detail work need to be checked first.
High UV exposure, heat cycling, Santa Ana winds, marine air near the coast, and intense winter rain can stress drains, scuppers, coping, flashings, seams, and previous repairs.
Useful roof documentation includes photos, observed deficiencies, drainage notes, access assumptions, visible moisture concerns, repair priorities, and a clear separation between urgent work and capital planning.
Replacement becomes the stronger option when repairs are chasing widespread wet insulation, failing seams, brittle flashings, displaced edge metal, poor drainage, or deck concerns.